City of Welch, WV – Water Project Experience

Location: Welch, West Virginia

Project: Welch Water Treatment Plant Upgrade. The project called for removal of the existing roof and installation of a new roof, replacement of the existing electrical system, demolition of three pressure filters, installation of a 4-cell gravity sand filter, replacement of two high service pumps, HVAC upgrades. In addition, the project also called for installation of approximately 7,000 LF of 12” PVC AWWA 200 water main, valves, hydrants, air release valves, service lines and reconnections, and all appurtenances.
Est. Cost: $3,000,000
Status: Completed May 2017

Project: McDowell Street/Riverside Drive Waterline Replacements
Design, Construction Administration & Inspection
Approximately 4,609 feet of 12”, 10”, 8”, and 6” water main along McDowell Street
Approximately 5,732 feet of 12”, 10”, 8”, 6”, and 2” water main along Riverside Drive
Est. Cost: $3,400,000
Status: Starting Construction

Project: Indian Ridge Industrial Park Water Infrastructure
Four contracts totaling over $7M in costs. 6.5 miles of 2” – 16” new waterlines, two 500,000 gallon water storage tanks, and two water booster stations. 434 new meter settings.
Est. Cost: $3.6M Bid Cost
Status: Completed

Project: Miscellaneous Water Storage Tank Replacement & Renovations
300,000 gallon ground storage tank, 130,000 ground storage tank, demolition of existing water storage tank, sandblasting and painting of existing 100,000 and 20,000 gallon water storage tanks, rehabilitation of existing 400,000 gallon water treatment reservoir
Status: Completed

Photos

Client:
City of Welch, WV

Service Type:
Civil Engineering 

Project Value:
N/A

Completion Date:
N/A

Project Area:
N/A