New River Resource Authority Landfill

T&L has been providing solid waste management consulting services to the NRRA for nearly 15 years having entered into our first Term Agreement in 2005. During this time, we have assisted the NRRA with a variety of projects involving surveying, engineering design, permitting, monitoring, architectural design, and Designer Led Design Build. This relationship with the NRRA is an excellent example of how we can serve as a consultant to our clients, become an advocate and serve as an extension of their in-house staff.

The following is a sampling of services T&L has provided the NRRA over the course of the last several years:

Designer Led Design Build
*Administration Building Expansion
*Entrance Gate and Security System
*Landfill Area C Expansion
*Landfill Area B Closure
*Maintenance Building and Garage Facility
*Stream Restoration (Floyd County Site)

Engineering Design/Permitting
*Basement Entry and Access Road
*Cloyd’s Mountain Facility Water and Sewer Systems Evaluation
*Gas System Extraction Plan for Area A
*Ingles Mountain Landfill Leachate System Evaluation
*Mulch Pad Relocation Project
*Sewer System Design for Future Gas-to-Energy Production Plant
*Wetland Delineation/Permitting for entire 930 Acre Cloyd’s Mountain Facility

Architectural Design
*Administrative Office Expansion Conceptual Design
*Existing Buildings & Reroofing and Maintenance

Monitoring
*Annual VPDES Stormwater Management Pond Sampling

Planning
*Annual Aerial Survey and Volume Calculations
*50-Year Development and Waste Management Plan
Update of Stormwater Pollution Prevention Plan

Photos

Client:
New River Resource Authority

Service Type:
Civil Engineering

Project Value:
N/A

Completion Date:
On-going