Roanoke Valley Broadband Authority

T&L was selected by the Roanoke Valley Broadband Authority (RVBA) in 2014 for Phase I and Phase II Fiber Optic Network design, including permitting and easement work throughout Roanoke County and the Cities of Salem & Roanoke, Virginia.

Highlights of the Phase I project included:

  • RVBA Phase I (NTP = 7/13/15; Completed 8/19/16) (Total Construction Cost = $4.1 Million)
  • Outside Plant (OSP) design & permitting
  • Designed 49 miles of buried 144 count fiber in 4-way Future Path conduit
  • Prepared network fiber utilization map and splicing diagrams
  • Designed 47 FTTx drops
  • Designed 2 miles of aerial 144 count fiber
  • Obtained following permits
    *VDOT Land Use Permit (LUP)
    *VMRC stream crossing permits
    *N-S railroad crossing permits
  • Provided bidding and construction phase services

Highlights of the Phase II project included:

  •   RVBA Phase II (NTP = 2/8/17; Completed 8/21/17) (Total Construction Cost = $2.7 Million)
  • Outside Plant (OSP) design and permitting
  • 36 miles of buried 144 count fiber in 4-way FuturePath conduit
  • Obtained following permits
    *VDOT Land Use Permit (LUP)
    *VMRC stream crossing permits
    *N-S railroad crossing permits
  • Provided consultation services associated with 36 miles of buried (bore and microtrenching), aerial, and bridge attachment fiber optic cable installation
  • Updated network fiber utilization map and splicing diagrams
  • Provided bidding and construction phase services

Photos

Client:
Roanoke Valley Broadband Authority

Service Type:
Civil Engineering

Project Value:
$6.8 Million 

Completion Date:
2015

Project Area:
85 miles (buried)